Skip to content
Colombe · RNI

Rassemblement National des Indépendants

التجمع الوطني للأحرار

National results

seats

66

16.7% · 395

·

Circonscriptions
57
Listes régionales
9
Score
14.0%

Member parties

  • RNI

Leadership & parliamentary role

Leadership

Mohamed Chaouki

Parliamentary role

Opposition

Seats by region

2026–2031 manifesto

The legislative electoral programme of the National Rally of Independents (RNI) for the 2026–2031 term is structured around three core commitments and 12 operational measures: protecting purchasing power through inflation-indexed direct assistance, incentivized savings, education tax credits, and minimum wage adjustments; expanding territorial public services in water, renewable power, pioneer schools, universities, and healthcare infrastructure; and driving economic inclusion by generating one million jobs, revamping unemployment benefits, formalizing seasonal labor, and offering zero-interest productive loans.

Key pledges

Institutionalization of Direct Social Assistance Indexing to InflationPossible

Social Protection

The scheme, targeting register, and managing agency already exist. Indexation can be legislated if its formula, threshold, exceptions, and funding are specified. Costs can remain manageable under moderate inflation, but a budget cap must not empty automatic adjustment of its meaning.

Creation of a Savings Shield for Informal Workers with a 25% State ContributionInsufficient data

Economy

Digital payment tools exist, but the pledge specifies no savings cap, expected beneficiary count, or budget. Public cost and the scheme’s real five-year scale therefore cannot yet be estimated reliably.

Upward Revision of Minimum Wages, Aligning SMAG with SMIG, and Pension RevaluationInsufficient data

Labor

Wage increases and convergence are legally feasible. But the programme sets no rate, convergence date, pension schemes, or financing source. Without those parameters and an updated pension actuarial study, the required 2026-2031 effort cannot be estimated.

Introduction of an Education Tax Credit of up to 5,000 MAD per Year per ChildInsufficient data

Education

A Finance Law can create this credit, but the promise does not define eligible families, covered expenses, or refundability. Those choices can greatly change both cost and who benefits. A credible budget estimate is therefore not currently possible.

National Residential Solar Self-Generation Programme with Zero Upfront CostInsufficient data

Energy

The legal framework exists, but the low-voltage surplus-sale tariff—central for most households—remained to be set on 8 September 2026. The programme gives no household count, capacity, budget, timetable, or credit guarantee. Its scale and repayment model therefore cannot be assessed.

Generalization of Pioneer Schools by 2028/2031 and Halving School DropoutHard

Education

Primary-middle pioneer rollout is budgeted and advancing quickly. But upper-secondary education lacks an equivalent quantified public timetable, while halving dropout requires a sustained decline of about 13% a year. Teacher development, pedagogical follow-up, rural transport, and school meals remain decisive.

Expansion of Universities from 12 to 27 and Completion of 12 Cities of Trades and SkillsHard

Higher Education

Completing all 12 Cities of Trades and Skills is already scheduled for 2026-2027. The main challenge is creating 15 autonomous public universities with legal status, governance, faculty, equipment, and recurrent funding. Current announcements show a pipeline, but not yet a complete schedule for 15 operating universities.

Rollout of Regional Health Groups Across All Regions by 2027Possible

Healthcare

Six regions had reached institutional GST launch by June 2026, and the legal framework and 2026 funding support continued rollout. Completing the remaining six by end-2027 is feasible, but a first board meeting does not yet demonstrate fully operational care pathways.

Deployment of 5,000 Rural Community Health Workers and Family Doctor ModelHard

Healthcare

Recruiting 5,000 workers is manageable in scale, but making family doctors the real anchor of rural care requires more general practitioners, durable placements, and functioning referral pathways. Health-workforce shortages and territorial disparities make the combined pledge demanding within five years.

Increasing Medical Density to 45 Health Professionals per 10,000 Inhabitants by 2030Not achievable

Healthcare

Available data place the verifiable density far below 45 and imply tens of thousands of net additions before end-2030. Recruitment and training are expanding, but their timing and scale do not yet appear sufficient. Reaching the target would require exceptional acceleration in hiring, graduation, and retention.

Completion of All University Hospitals by 2029, Upgrading/Building 1,800 Health Centers, and 100 Mobile UnitsHard

Healthcare

The announced primary-care pace makes the rehabilitation component credible. But completing every CHU before end-2029 leaves little room for construction, procurement, equipment, and staffing delays. Delivery depends on very tight management and published project-by-project schedules.

Rollout of the Unified 141 Emergency Hotline and 12 Regional SAMU UnitsPossible

Healthcare

The network had nine SAMU units in 2023, leaving at least three to make operational across all 12 regions. The 2026 141 pilot shows upgrade capacity. The target can be delivered if dispatch teams, ambulances, and hospital emergency services receive sustained funding.

100% AMO Coverage for Telemedicine and Phased Public Sector Third-Party Payer SystemInsufficient data

Healthcare

Telemedicine has a legal framework and AMO already covers a large share of the population. But covered services, tariffs, baseline reimbursement, expected volume, and third-party-payment costs are undefined. Financial feasibility therefore cannot be assessed reliably.

Reduction of Unemployment to 9% via 15 Billion MAD Mobilization and 33% GDP Investment RateHard

Employment

The latest strict-unemployment rate, 9.5%, is close to the 9% target. But the programme links that reduction to five years of 5% growth, above available projections. Achieving and sustaining durable private-sector jobs amid labour-force changes and climate risks remains demanding.

Creation of One Million Jobs by 2030 Distributed Across Key SectorsHard

Employment

Reaching one million net jobs by end-2030 would require about 232,000 net jobs a year after 8 September 2026—over 20% above the 2025 result. That pace is possible, but it must persist for more than four years despite agricultural volatility and without double-counting the same jobs.

Targeting 250,000 Annual Professional Placements via Employment Schemes and NEET IntegrationHard

Employment

Moving from ANAPEC’s 151,000 placements in 2024 to 250,000 every year requires an increase of about two thirds. It depends on more job openings, stronger matching capacity, NEET-focused training, and tracking whether beneficiaries remain employed.

Reform of Unemployment Benefits into a Return-to-Work Allowance at 70% for 12 Months Capped at 4 SMIGHard

Employment

The reform combines doubled duration, a fourfold ceiling, and easier access. For claimants at the ceiling, the theoretical maximum would increase eightfold. It can be enacted before 2031, but requires legislation, an actuarial study, durable financing, and strong CNSS-ANAPEC controls.

Introduction of Seasonal Worker Cards and a 70% Seasonal Return-to-Work Allowance for up to 6 MonthsInsufficient data

Labor

The proposed benefit is far easier to access than the current allowance and can reach about MAD 28,751 per person over six months at the ceiling. Without eligible-worker numbers, a claims forecast, and financing, its annual cost and actual coverage cannot be established credibly.

Establishment of a State-Guaranteed Zero-Interest Productive Loans FundPossible

Finance

Establishing and launching the fund between 2026 and 2031 is feasible: Morocco already has a microfinance framework, a public guarantee institution and experience deploying large credit programmes. Its scale and financial sustainability remain unknown because no budget, beneficiary volume, guarantee ceiling or loss-sharing rules are specified. They would depend on approved appropriations and disciplined risk management.